Home / Solutions / LED displays by application / Stadium scoreboard and perimeter LED
LED display · Outdoor
Stadium scoreboard and perimeter LED
Stadium scoreboard and perimeter LED screens show the score, replays and sponsor advertising to spectators in the stands and viewers at home at the same time. We build the scoreboard, the perimeter boards and the ribbon screens on the stands to be managed from one control room.
01
How the system works
Time and score data, the broadcast camera feed and advertising content feed the video processor in the control room. The operator manages the scoreboard layout and the perimeter advertising sequence from there. Sending cards carry the picture over fibre to the LED cabinets in the stadium.
- Data sourcePrices, departures, scoreSourcesComputer, camera, broadcastCameraIn sync with the screen
- Video processorScaling, source switching
- Sending cardDistributes the picture
- Data lineCAT6 or fibre
- LED cabinetsReceiving cards and modules
Example system flow. Screen size, pixel pitch and structure are fixed in the design, to suit the site.
02
Advantages
Readable from every stand
Screen size and pixel pitch are calculated for the farthest seat; a wide viewing angle covers the side stands.
A clean picture on air
Perimeter boards run at a refresh rate that does not flicker on the broadcast camera.
Sponsor revenue
Perimeter and ribbon screens provide rotating advertising space throughout the match.
Player safety
Perimeter cabinets are chosen with a soft front surface that absorbs impact.
Brands and ranges we use in this system
03
The Upout difference
Our own brand: Upled
We supply LED displays under our own brand, Upled, with cabinets, modules and spare parts from one source.
01See it before it is built
We place the screen in a 3D model of the site, so size and sightlines are seen together before production.
02The right pixel pitch
We calculate pixel pitch from viewing distance and content; we do not propose a screen that is dearer than needed or too coarse.
03Service and spare parts
A spare-module plan is ready at handover; the team that installed the screen attends when there is a fault.
0404
Our project flow
- 01
Survey and brief
We settle the location, viewing distance and content plan together.
- 02
Design and pre-visualisation
We set screen size, pixel pitch and structure, and prepare the 3D view.
- 03
Proposal and technical design
Product list, drawings and schedule arrive in one file.
- 04
Production and supply
The screen is tested before shipment; spare modules travel with it.
- 05
Installation and commissioning
Structure, mounting, calibration and content system set-up.
- 06
Training and service
User training, handover file and after-sales support.
Frequently asked questions
Can the scoreboard be connected to the referee and timing system?
Yes. Score and time data are taken from the timekeeping system in use and fed into the scoreboard template. We clarify at the start of the project which system is used and test the data connection at commissioning.
Does the supporting structure change when an existing scoreboard is renewed?
The new screen’s weight and wind load are compared with the existing structure. If it is adequate, it is kept; if not, strengthening or a new structure is designed with the building’s structural engineer.
Related pages
- LED totem displayLED displays by application
- LED signage displayLED displays by application
- Stadiums and sports venuesSectors
- LED display and video systemsSolutions
- Engineering and project consultancyEngineering and consultancy
- After-sales support and serviceAfter-sales support
Terms on this page
Let’s plan your project together.
Whether you have architectural drawings, a specification or just an idea, our engineering team is ready for a survey and concept design.