What is commissioning?
Commissioning is the stage where an installed system is adjusted and tested until ready for use. It covers measurement, equalisation, delay and level settings for a sound system, brightness and colour calibration for an LED display, and scenario tests for control systems. Results are compared with design targets, users are trained and the system is handed over with up-to-date documents.
01
How it works and what it changes in a project
Commissioning follows a set order. First, cables and connections are checked, devices powered up and software updated. Network addresses and signal routes are then configured. Next, the sound system is measured with a microphone, the LED display checked with test images and every control-panel button tried. Finally, real usage scenarios are run and the results recorded in a test report.
This stage shows how close the system comes to the design; the same equipment performs very differently tuned and untuned. The space must be ready: construction dust gone, furniture in place, power and network permanent. When the programme is squeezed, this is often the first task cut short, so it needs its own period in the schedule. Acceptance criteria defined in the contract make handover smoother.
02
What to look for
- Reserve a protected period for commissioning in the programme, separate from installation.
- On measurement day the space should be quiet, clean and furnished.
- At handover, ask for the test report, a backup of settings files and user training.
Related terms
- As-built drawingsControl and project process
- Single-line diagramControl and project process
- LED display calibrationLED display and video
- Sound simulationProfessional audio
Related pages
Let’s plan your project together.
Whether you have architectural drawings, a specification or just an idea, our engineering team is ready for a survey and concept design.